GRUPOTEC has built a turnkey hydro-propelled pump installation (an innovative system developed by the Dutch company aQysta, our client). Installed on the Main Canal of the Turia, it supplies an irrigable area of 20 ha using only hydraulic energy.
The project, on a demonstration scale, is funded by the H2020 program of the European Union.
– Maximum flow: 20 l / s
– Elevation: 25 mca

Compartir