Los Cantiles Composting Plant, Madrid City Council

"Project management of the most advanced organic waste treatment plant in the Community of Madrid, with a capacity of 102,490 tonnes per year. A flagship facility in the circular economy that converts urban bio-waste into high-quality compost. "

Data

102.490 t/year

Region

Valdemingómez, Madrid, Spain, 2025

Los Cantiles Composting Plant, Madrid City Council

The circular economy and innovation for the benefit of the city

Los Cantiles, located in the Valdemingómez Technology Park, is the first composting plant in the Community of Madrid to incorporate an automated system using artificial intelligence for process monitoring and management. Grupotec has been responsible for project management and site supervision since 2020, ensuring the highest standards of quality, safety and minimisation of environmental impact throughout the construction phase, which began in 2022.

The facility transforms separately collected food waste, organic waste from Mercamadrid and green waste into more than 37,000 tonnes of compost suitable for agricultural use each year. Its office building has been certified as Passivhaus Premium — the first in Spain to receive this distinction and the second in the world — and features a self-consumption photovoltaic plant of almost 1 MWp, representing a total investment of 48.5 million euros, co-financed by the EU’s Next Generation funds.

Key aspects of the project


AI-powered automated composting, Passivhaus Premium certification and the circular economy at an urban scale.

Technological innovation

Madrid’s first composting plant with integrated AI for real-time monitoring and control of all processes.

Sustainable building

A Passivhaus Premium-certified office building – the first in Spain and the second in the world to meet this nearly zero-energy standard.

True circular economy

Over 37,000 tonnes per year of high-quality compost produced from urban organic waste for use in agriculture and gardening.

The Los Cantiles plant: a milestone in composting

22,000 m²

built-up area

102,490 tonnes per year

total waste recovery capacity

37,000 tonnes per year

high-quality compost produced

6 years

of collaboration