Celeno & Deneb solar power stations
Two utility-scale ground-mounted solar parks in the municipality of Teba, in the province of Málaga, carried out on an EPC basis for the client. The scope included the design and construction of a 30/220 kV, 116 MVA feed-in substation and the associated 30 kV underground cable, ensuring connection to the transmission grid. With a combined capacity of almost 90 MWp, the project reinforces Grupotec’s contribution to Andalusia’s renewable energy mix.
Power
88 MWp
Region
Teba (Málaga, Spain) 2025
Market
Solution