Skip to content
  • es
  • CONTACTO
  • Twitter
  • Linkedin
  • attclientes@grupotec.es
Grupotec
  • Home
  • About Grupotec
    • People
    • Values
    • CSR
    • Work at Grupotec
  • News
  • Photovoltaic
    • Development
    • EPC
    • Operation and maintenance
    • Asset management
    • Projects
  • Industry
    • Food sector
    • Logistics and distribution
    • Other industries
    • EPC
    • Hydraulic industrial management
    • Projects
  • Environment
    • Residue treatment
    • Environmental Industry
    • Water cycle
    • Projects
  • Energy Efficiency
    • Energy efficiency
    • PV plants for self-consumption
    • Cogeneration plants
    • Other renewable energies
    • Projects
  • Construction
    • Architecture
    • Engineering in installations
    • Project management
    • Asset management
    • EPC projects
    • Projects
Mejora de eficiencia energética para estaciones de bombeo – Canal del Zújar

Mejora de eficiencia energética para estaciones de bombeo – Canal del Zújar

September, 2018 by Guillermo AC chat_bubble_outline 0 comment(s)
SEIASA MESETA SUR (MINISTERIO DE AGRICULTURA)
Situación:
Badajoz (España)
Servicios:
Estudio de viabilidad, Ingeniería de construcción
Datos:
27 MW bombeos (11 estaciones), 21.000 ha regadas
Fecha:
2011

Share:

Facebook
Twitter
Google+
LinkedIn
Pinterest

Post navigation

Previous PostImplantación de red de riego a presión
Next PostEstación de bombeo y embalse de regulación para trasvase Júcar-Vinalopó

Written by Guillermo AC

Avda. de los naranjos 33
46011 Valencia,
España

96 339 18 90
attclientes@grupotec.es

Aviso legal
Política de privacidad
Poítica de cookies

  • Twitter
  • Linkedin
  • attclientes@grupotec.es
Utilizamos cookies propias y de terceros para ofrecerle una mejor experiencia de usuario. Si continúa navegando, consideraremos que acepta nuestra Política de cookies.
Cerrar